The Ultimate Guide To 140. Country risk assessment for export transactions
A demurrage demand in dry bulk shipping is often a fee imposed within the charterer if the process of loading or unloading cargo at a port normally takes longer than the agreed-upon time, referred to as laytime.600 (UCP 600. The UCP is often a set of contractual rules which are often incorporated by Categorical agreement into a documentary credit (